On site

Industrial preventive maintenance on site

Not every asset can travel to the workshop. Industrial preventive maintenance takes the workshop standard to the plant: inspection, testing and work carried out on the installed machine.

Worker hooking the sling onto the hoist above a wheelset assembly in the Coronel workshop

Industrial preventive maintenance with engineering judgment

The aim is to hold the equipment's condition between major overhauls. Dirt, moisture, loose connections and unlubricated bearings account for an enormous share of electrical failures, and all of them can be tackled in the plant.

We schedule the work inside the operation's maintenance windows, with the scope agreed beforehand so the shutdown lasts exactly as long as it should.

We cover operations throughout the country from our base in Coronel, with the same engineering judgment we apply to rail assets.

Scope

What the service includes

On-site inspection

Review of the installed machine, its connections, its mounting and its operating environment.

Cleaning and reconditioning

Removal of contamination and dust from the winding and the ventilation system, a frequent cause of overheating.

On-site testing

Electrical and thermal measurements on the installed machine, with no need to move it.

Bearings and lubrication

Verification of bearing condition and of the lubrication plan, correcting whatever needs it.

Alignment and mounting

Review of alignment and fixing: a small misalignment destroys bearings in very little time.

Condition report

A record of the state found, the work performed and the recommendations for the next window.

How we work

The process, step by step

  1. 01

    Scope

    We define which machines are covered and what will be done to each one.

  2. 02

    Scheduling

    We fit the work to the operation's maintenance window.

  3. 03

    On-site execution

    Work carried out in the plant, to the workshop standard.

  4. 04

    Close-out

    Condition report and recommendations for the next intervention.

When it applies

Signs that you need this service

  • The equipment runs in dusty, humid or high-temperature environments
  • Plant shutdowns are used without a scope agreed beforehand
  • There are motors that have never had documented maintenance
  • Bearing failures repeat on the same machines
  • The critical machine cannot be moved to the workshop
  • There is no specialist staff for electrical maintenance in the plant

Industrial preventive maintenance

Frequently asked questions

Do you provide on-site service outside the Biobío Region?

Yes. Our base is in Coronel and we serve operations throughout Chile. Scope and logistics are agreed case by case, according to the size of the job.

Can maintenance be done without shutting the plant down?

Part of it, yes: thermographic inspection and vibration analysis are done with the equipment running. Electrical testing and physical work require the machine stopped and de-energized, and are scheduled inside the maintenance window.

How is this different from sending the equipment to the workshop?

Preventive maintenance holds the condition of the installed machine and keeps it from degrading. Workshop work is for when the diagnosis calls for a major overhaul (rewinding, VPI, balancing), which needs infrastructure that does not exist in a plant.

How often should it be scheduled?

It depends on the severity of the environment and the criticality of the asset. A motor in a clean environment under steady load tolerates long intervals; one in dust, moisture or severe load cycling needs much shorter ones.

You may also need

Related services

Rotating electrical equipment

Repair and maintenance of generators, alternators and industrial electric motors: rewinding, VPI, balancing and testing. Rail, mining, ports and industry in Chile.

Predictive maintenance

Condition monitoring for critical assets: vibration analysis, thermography and variable tracking to move from reactive to predictive maintenance and sustain availability.

Maintenance engineering

Maintenance plans built on criticality and operational evidence: root cause analysis, per-asset strategy and availability indicators. Truck Energy's Confiabilidad 360° framework.